Newton Commuter Rail Stations Accessibility Improvements
We’re planning accessibility upgrades at three Commuter Rail stations on the Framingham/Worcester Line in Newton. Currently, the existing low-level single side platforms can only be accessed by stairways at Auburndale, West Newton, and Newtonville stations.
Status: Design Development phase, progressing from 30% to 75%
Project Features
This project will address the MBTA’s reliability and modernization needs at each station, including track and signal upgrades.
Improvements include two fully accessible, high-level side platforms at each station and accessible pathways to each platform from the adjacent sidewalk network and station parking areas.
Building a Better T
As part of our $9.6 billion, 5-year capital investment plan, we're renovating stations, modernizing fare collection systems, upgrading services for our buses, subways, and ferries, and improving the accessibility of the entire system.
Accessibility upgrades at Auburndale Station include:
- Sloped walkway connections to the Auburn street parking lot, sidewalk, and the pick-up and drop-off area
- A ramp connection from the Auburn St Bridge to the station
- Elevator and stair connections between the station platforms
Accessibility upgrades at West Newton Station include:
- Elevator and stair connections from the Washington St sidewalk to the station
- Elevator, ramp, and stair connections between the Washington St parking lot and the pick-up and drop-off area to the station
- A sloped walkway pedestrian underpass from the Webster St parking lot to the station
- Elevator and stair connections between the station platforms
Accessibility upgrades at Newtonville Station include:
- Elevator and stair connections from the Washington St sidewalk and the pick-up and drop-off area
- Elevator and stair connections between the station platforms
Other features include:
- Benches
- Canopies
- Tactile warning strips
- Wayfinding signage
- Bicycle racks
- Dedicated pick-up and drop-off areas
Past Events
Contact Us
For all queries and comments related to Newton Commuter Rail Stations Accessibility Improvements, please contact NewtonCR@mbta.com.
For More Information
Get project news, updates, and more delivered right to your inbox.
Recent Updates
Building a Better T
As part of our $9.6 billion, 5-year capital investment plan, we're renovating stations, modernizing fare collection systems, upgrading services for our buses, subways, and ferries, and improving the accessibility of the entire system.